Active programme · Uganda

Energy for Economic Transformation — Uganda 1.5 GW Solar Programme

A private-sector-led initiative to deploy 1,500 MW of utility-scale solar across Uganda — diversifying a hydro-dominant grid, extending clean electricity access, unlocking regional exports through the East African Power Pool, and catalysing climate finance at scale.

Utility-scale solar deployment representative of the EET programme
1.5 GW
Utility-scale solar capacity
~2.5 TWh/yr
Clean generation
1.2–1.4 MtCO₂e
Emissions avoided / year
35 jobs/MW
Direct & indirect employment

Executive summary

Uganda's power mix is 92% renewable but 80% hydro — leaving the grid exposed to drought and climate variability, while only about 30% of Ugandans have reliable electricity. The EET programme deploys 1,500 MW of utility-scale solar to diversify supply, extend access, and build climate resilience, harnessing Uganda's abundant solar resource (≈2,408 sun-hours/year, with peak irradiance in the Karamoja sub-region).

The programme is structured as a bankable IPP pipeline: independent power producers design, finance, build, and operate the plants under long-term PPAs, while the public sector focuses on land, licensing, tariffs, and grid expansion.

Programme components

  • Flagship capacity in Karamoja

    Anchor sites in the Moroto–Nakapiripirit corridor, where irradiance and grid-expansion plans align.

  • Regional grid integration

    Full integration into the East African Power Pool, unlocking exports to Kenya, Rwanda, DRC, and South Sudan.

  • Bankable IPP pipeline

    Feasibility, structuring, and preparation support for a private-sector-led project pipeline.

  • Enabling infrastructure

    Grid upgrades, EV charging infrastructure, and workforce capacity building across the sector.

Investment & returns

  • USD 0.5–1M preparatory facility for studies, structuring, and stakeholder engagement.
  • USD 1.2–1.95B downstream construction — solar farms, grid upgrades, charging infrastructure, capacity building.
  • Indicative IRR of 10–20% and payback of 6–10 years, benchmarked against comparable regional projects.
  • Aligned with Uganda's Vision 2040, National Energy Policy 2023, and SDGs 7 & 13.

Get involved

Building Uganda's next generation of clean power — together.

We're actively engaging developers, financiers, and public-sector partners around the EET programme. If your organisation is exploring utility-scale solar, grid integration, or East African clean-energy exports, we'd love to talk.